Listing preparation checklist
A free listing prep checklist for real estate agents: access and utilities, safety and papers. Agent observation notes, not a property inspection.
Access and utilities
- Utilities on: water, power, gasReady · Needs work · Not checked
Look: Every utility on for the inspection day.
Report: An off utility turns several items into Not inspected.
- Attic opening clear (22 by 30 in.)Ready · Needs work · Not checked
Look: Nothing stored under or in front of the attic opening.
Report: Clear it before the inspector comes.
- Crawl space opening clear (24 by 18 in.)Ready · Needs work · Not checked
Look: Only for pier and beam houses.
Report: Mark it Not checked on a slab.
- Electrical panel clear (36 in. in front)Ready · Needs work · Not checked
Look: Nothing stacked in front of the panel.
Report: Do not open the panel.
- Keys, gate and alarm codesReady · Needs work · Not checked
Look: Sheds, gates, the alarm.
Report: Leave them with the lockbox.
Safety
- Smoke and CO alarms have batteriesReady · Needs work · Not checked
Look: Press each test button.
Report: Replace dead batteries.
Papers
- Prior inspection reportsReady · Needs work · Not checked
Look: Any report from earlier sales or repairs.
Report: Have copies ready.
- Repair receipts and transferable warrantiesReady · Needs work · Not checked
Look: Foundation warranties first.
Report: Ask the company how to transfer the warranty.
- Permits for additions and big repairsReady · Needs work · Not checked
Look: Additions, re-roofs, foundation repairs.
Report: Have the permit numbers.
- Roof age knownReady · Needs work · Not checked
Look: The year of the last roof.
Report: Write it in the note.
These are the agent’s observation notes, not a property inspection.
Run it in FollowStack
In the app this checklist runs in walking order. A clean section takes one tap and a finding takes a photo and a confirm, then one more tap sends the report.

More free checklists
- Foundation inspection checklist
- Annual foundation follow-up checklist
- Pier installation log
- Foundation repair final walkthrough
- Irrigation inspection checklist
- Sprinkler start-up and winterization checklist
- Weekly landscape maintenance checklist
- Plant installation and warranty sheet
- Pre-job 811 and site safety checklist
- Pre-existing conditions sign-off
- Contractor final walkthrough checklist
- Job site cleanup checklist
- Home showing checklist